Healthcare
Cleveland Clinic
Cleveland, Ohio
Legacy Controls Upgrade -
Main Campus
Retrofit Legacy Johnson Controls on (32) Central Station VAV AHU’s, (2) Chiller plants, (8) Steam to hot water Heat exchanger + Variable speed pumps, (12) Equipment alarm and Exhaust Fan status panels, in (10) different buildings. All conversions completed during off hours with no loss of service to the end user.
|
Cleveland Clinic “L” Building Renovation LEED
Complete rebuild of (5) Central Station VAV AHU’s, Replacement of (1) Chiller Plant, (1) new backup Generator monitor and space conditioning, (80) VAV boxes.
|
|
Nationwide Children's Hospital
Columbus, Ohio
Nationwide Children's Hospital -
Replacement Hospital
Delta Controls Building Automation System includes control and monitoring of 17 AHU’s, 4 Heat Recovery Units, Exhaust Systems, 900 VAV’s, refrigerator and freezer monitoring, HW/CW central plants and critical systems. The project includes BACnet integrations into chillers, VFD’s, Power Logic systems, Phoenix Labs, Fieldserver and fire alarm
|
Nationwide Children’s Hospital -
Central Energy Plant
The Nationwide Children’s Hospital Central Energy Plant Delta Controls Building Au-tomation System (BAS) includes controls/monitoring of a campus wide chilled water and steam plant along with extensive integration to the campus electrical switch-gear and emergency generator systems.
|
|
Other Healthcare Projects
Columbus, Ohio
The Ohio State University Medical Center
The Ohio State University Medical Center is a state of the art medical complex with over 12 buildings and 4 million square feet. BCI has installed Delta Controls in several buildings including the Ross Heart Hospital, The James Cancer Hospital, Biomedical Research Tower, Doan Hall, and Rhodes Hall. BCI Continues to value our partnership with OSU Medical Center through a long standing service agreement to maximize their building automation needs.
|
Dublin Methodist Hospital
The Dublin Methodist Hospital Delta Controls Building Automation System includes control and monitoring of 9 AHU’s, 528 VAV’s, HW /CHW central plants, room pres-surization, emergency generator and critical systems. The project includes BACnet integrations into chillers and fire alarm monitoring.
|
|
|
 |
 |
|
 |
|