The Ohio State University


Location

Over ten years ago, the first BACnet project was installed at The Ohio State University by Building Control Integrators (BCI). Since then, BACnet has become the adopted control's standard for the university. The original project included three main BACnet panels, manufactured by Delta Controls, with only 128 total inputs and outputs. Today, there are approximately 150,000 physical points throughout 65 facilities. The OSU BACnet network is currently comprised of 19 different vendors with connectivity to multiple system types. The Ohio State University employs the BACnet protocol to its fullest extent and benefits greatly from the standardization of systems. Moreover, the university continues to profit from the bidding process as several contractors/manufacturers are readily available with BACnet product.
Evans Chemistry Lab

The Ohio Union


The OSU Ohio Union Delta Controls Building Automation System includes control and monitoring of 17 AHU's, 294 VAV's, HW / CHW central plants and critical systems. The project includes BACnet integrations into chillers, fire alram monitoring systems and Johnson Controls front-end.
Evans Chemistry Lab

Thompson Library


The Ohio State University Thompson Library project includes control and monitoring of 19 AHU's, 300 VAV's, atrium smoke evacuations, stairwell pressurization and fireman's override panels, Wireless temperature sensors were used throughout the facility in order to comply with architectural considerations. integration of the central plant is done through the Honeywell HC900 and GE Fanuc control systems.
OSU Ross Heart Hospital

Ross Heart Hospital


The Ohio State University Ross Heart Hospital project includes a state of the art medical complex with over 12 buildings and 4 million square feet. BCI has installed Delta Controls in many of the facilities including integration into the existing campus wide BACnet network from multiple manufacturers.
Scott Laboratories

Scott Laboratories


The Ohio State University Scott Laboratories project includes Delta Controls Build Automation System which includes control/monitory of 8 AHUs, 353 VAVs, laboratory environmental and lighting apparatus, HW/CW central plants, critical systems including Phoenix Lab Controls.
Psychology Building

Psychology Building


The Ohio State University Psychology Building project includes Building Delta Controls Build Automation System (BAS) which includes control/ monitoring of 6 AHUs, 2 EAHUs, 207 VAVs, Laboratory environmental and lighting apparatus, HW/CW central plants, critical systems including Phoenix Lab Controls.

The Michigan State University


East Lansing, MI

Facility for Rare Isotopes Building (FRIB) - High Bay

Facility for Rare Isotopes Building


BCI has partnered with Michigan State University on the Facility for Rate Isotope Building (FRIB). This Design Assist project includes Delta Controls Build Automation System (BAS). The facility includes specialized systems for Cryo Plant Systems, Process Water Systems-- Low Conductivity, Acivated Water, Process Cooling, Process Heating, Steam LINAC Tunnel, and Target Building Applications. BCI has also completed the installation for the High Bay project including new installation of Delta Controls BAS integrating 3 Cooling Towers, CWS, HWS, Condensate Return Monitoring, Air Curtain Systems, Exhaust Air System, Power Monitoring, Steam Meter Monitoring, and Scrubber Exhaust System.
Broad Art Museum

Broad Art Museum


The Michigan State University Broad Art Museum project includes Control and monitoring of 3 AHU's, 16 TU's, Remote Air Cooled Chiller, CWS, HWS, Snow Melt System, Aircuity System, Power Monitoring, Steam Meter Monitoring, Generator/Transfer Switch Monitoring, Wireless Control of Perimeter Hot Water FTR's, and Humidity Monitoring System.
Wells Hall

Wells Hall


The Michigan State University Wells Hall project includes Control and monitoring of 5 AHU's with optimization, 115 VAV's, Cooling Tower System, CWS, HWS, Snow Melt System, CO2 Monitoring, Window Shade Control and Optimizations system, and Exhaust Air System.
Bailey/Rather Halls

Bailey/Rather Halls


The Michigan State University Bailey/Rather Halls projects include the Delta Controls Build Automation System which includes control/monitoring of CWS, HWS, Snow Melt System, Lighting System Controls, CO2 Monitoring, Power Monitoring, Electric Meter Monitoring and 500 FCU's.

The Miami University


Oxford, Ohio

Kreger Hall

Kreger Hall


The Miami University Kreger Hall project includes Building Delta Controls Build Automation System (BAS) which includes control/monitoring of 2 AHU's, 79 VAV's, heating and chilled water distribution systems and laboratory supply and exhaust air valve controls.
Etheridge Hall

Etheridge Hall


The Miami University Etheridge Hall project includes Building Delta Controls Build Automation System (BAS) which includes control/monitoring of 4 MAU's, 1ERU, heating and chilled water distribution systems and fan coil unit controls for 180 dormitory rooms and common areas.
McFarland Hall

McFarland Hall


The Miami University McFarland Hall project includes Building Delta controls build Automation System (BAS) which includes control/monitoring of 1 AHU, 1 ERU, heating and chilled water distribution systems and fan coil unit controls for 98 dormitory rooms and common areas.
Anderson Hall

Anderson Hall


The Miami University Anderson Hall project includes Building Delta Controls Build Automation system (BAS) includes control/monitoring of 1 AHU, 1 ERU, heating and chilled water distribution systems and fan coil unit controls for 142 dormitory rooms and common areas.

The Ohio University


Athens, Ohio

E.W. Scripps Hall

E.W. Scripps Hall


The Ohio University E.W. Scripps Hall project includes Delta Controls Build Automation System (BAS) which includes control of 3 AHU's integrated with Vykon Jaces to Tridium Front End.
Bio-Chemistry

Bio-Chemistry


The Ohio University Bio-Chemistry project includes Delta Controls Build Automation System (BAS) which includes control of a AHU, 16 VAV's, HWS, CWS, all integrated with Vykon Jaces to Tridium Front End.
Lin Art Museum

Lin Art Museum


The Ohio University Lin Art Museum project includes Delta Controls Build Automation System (BAS) that includes control of 4 AHU's, 12 Zones all integrated with Zykon Jaces to Tridium Front End.
Botanical Research

Botanical Research


The Ohio University Botanical Research project includes Delta Controls Build Automation System (BAS) that includes control of 4 AHU's, 12 HW Converter and Zone Pumps, 12 Zones All integrated with Vykon Jaces to Tridium Front End.

Other Higher Education


Grasselli Library & Breen Learning Center

John Carroll University -
Grasselli Library & Breen Learning Center


Delta Controls Build Automation System (BAS) includes control of 4 AHU’s, Cooling Tower, Chiller, and heat pumps tied into Delta Controls Energy Management Software, enteliWEB.
Case Western Reserve University Bio Enterprise

Case Western Reserve University -
Bio Enterprise


Integration of the existing TAC controls into Delta Controls enteliWEB Energy Man-agement Software. Energy savings are trending, graphed and reported on.
CSU Euclid Avenue Student Housing

Cleveland State University -
Euclid Avenue Student Housing


Delta Controls Build Automation System (BAS) includes control and monitoring of (8) Common Area single zone AHU’s, (4) Central Station VAV AHU’s, (75) VAV boxes, Central plant interface, Common area fin tube valves.
CSU Middough Building

Cleveland State University -
Middough Building


Delta Controls Build Automation System (BAS) includes control and monitoring of this historic building into classrooms and lab area for the performing arts. (4) Central station AHU’s, 120 VAV boxes, hot water fin tube control valves for perimeter con-trol, steam to hot water Heat exchanger and variable speed pumps.
CSU Fenn Tower

Cleveland State University -
Fenn Tower


Delta Controls Build Automation System (BAS) includes repurposing historic 15 sto-ries into student housing. Central plant controls for water source heat pump loop, Steam to hot water Heat exchanger and variable speed pumps, Cooling tower, do-mestic hot water heat exchanger. Stairway pressurization, Smoke control.